TIP: Choosing your connection type.

    Choose ‘New Natural Gas Connection’ if your business property has connected to natural gas for the very first time and if it’s been 6 months or less since the gas meter has been installed.

    Choose ‘Already Connected to Natural Gas’ if you have had gas connected to your business property for longer than 6 months OR if it is re-connecting to natural gas.

    If you need to verify the date of your gas meter installation, you can contact us on 1300 001 001 (Option 7). We suggest you have your gas meter number handy before you call.

    agn footer logo